Tristan and Toby getting there with the Solar Farm project

Some dry weather has made all the difference for everyone, and we are now nearing completion.   A Job well done by everyone

Timber by Batsford, Warminster, Wiltshire                       https://www.batsfordtimber.co.uk/index.php?route=common/home

Wire and gates by Tornado Wire, Bidford-on-Avon         https://www.tornadowire.com/

Tracks by E D & W Bodman, Melksham, Wiltshire           https://www.edwbodman.co.uk/

In our earlier posts, we touched on the timber and wiring aspects of the project.   As groundworks contractors, Bodmans have to strip the topsoil, lay a membrane and then supply and level a layer of clean stone. This is then topped off with a final smaller stone and compacted, leaving a camber to avoid any water settling on the surface.

28 March 2025

Tristan and Toby getting there with the solar farm project