Range refurbishment at Bulford

We had recently won a contract to strip from site 450 tons of hazardous and contaminated sand used as a stop butt on a military firing range.  After stopping bullets for years it was time to be replaced with new,  along with some timber repairs while we were there.

All done while the ranges either side were live and active!

Range refurb at Bulford March 2019