Something a little different for us – we recently started a project to refurbish a grenade range at Warminster.
We needed to remove 500 tons of limestone gravel, undertake repairs to the sub-base and increase the area to the required specification.
The throwing bays were also dug out and will be restored once the main range floor has been reinstated.