This is now complete. Following a successful planning application approval, the brief was to build a 40 x 20m sand arena. The topsoil was removed and the site levelled with drainage and soakaway. Then a stone sub-base with a membrane underneath was laid, then a second membrane. Finally, the correct sand type was added along with post and rail fence and gates installed.