Following a long tender process with Landmarc Ltd, on behalf of Defence Infrastructure Organisation (DIO), we won the contract for the refurbishment to Bulford Firing Range “C” to bring it up to modern compliance specification. DIO is part of the Ministry of Defence.
The project required the old tarmac and timber range floor to be removed and the firing trenches replaced with pre-fabricated concrete structures made off-site. We then fitted recycled plastic edging and then covered the whole site in a soft-pour surface.
We completed the project within the month, due to strict time constraints. Although the range we were working on was closed for the works to be carried out, neighbouring ranges were kept in use with live firing on a daily basis. This is the first firing range on Salisbury Plain with this finish.
Landmarc/DIO now have a safer range with no ricochet hazard; one that is maintenance free and hard wearing.
See our Case Study here. Firing Range at Bulford June 2018 e
See some of our other work here which doesn’t fall neatly into our trees/fencing/weeds categories!